← Back to Maintenance Menu

Sluice Room Check Guide

Getting Started

The Sluice Room Check system helps ensure that all sluice room facilities are properly maintained and meet safety standards. This guide will help you complete thorough and accurate inspections.

Important Note: All inspections must be completed with accurate temperature readings and honest assessments of room conditions. Your confirmation at the end certifies the records as true and correct.

Basic Information

Tip: Be as specific as possible with the location to ensure proper tracking of different sluice rooms.

Room Condition Checks

Note: For each item, select either "Yes" (good condition), "No" (needs attention), or "N/A" (not applicable) where available.

Temperature Readings

Tip: Always allow the water to run for a few seconds before taking temperature readings for accurate measurements.

Comments and Additional Information

Submitting Your Check

  1. Review all entries for accuracy
  2. Check your name is correctly displayed
  3. Tick the confirmation checkbox to certify the records
  4. Click "Create Sluice Room Check" to submit
Note: The submit button will remain disabled until you check the confirmation box. This ensures you have reviewed and verified all information.